Structure of the steel structure for the Wageningen University parking garage

The construction of the 2-layer parking garage at Wageningen University is progressing smoothly! In September, there were some troubles due to the extreme rainfall. As a result, extra measures had to be taken to carry out the groundwork for the construction site. This has all been solved well after which the foundation strips have been poured. We have already started building the steel construction! Herewith some pictures of the progress.