EZ Park has built this car park as part of the Brainport Industries Campus (BIC).

  • Customer
    Brainport Industries Campus
  • Capacity
    1.000 parking spaces
  • Duration of construction
    6 months
  • System
    Garage type B
Preservation of landscape image

Preservation of landscape image

In order to meet a parking demand of more than 1,000 places for cars and bicycles and at the same time to maintain the landscape image, it has been decided to place the parking garage in the ecological main structure. Facade vegetation tilts up along the stainless steel tension wires, so that the steel structure is slowly incorporated into the greenery.

Usability and safety

Usability and safety

The 5-layer parking garage is a ramp on the front side of the building. With a column-free parking unit of 16.3 meters, the ease of use and safety is optimized. The supporting construction guarantees a long service life and can be dismantled and reusable. If the parking demand increases, an extension in the plan has been taken into account.

Korte bouwtijd, hoge kwaliteit

Korte bouwtijd, hoge kwaliteit

De parkeergarages van EZ Park kennen een relatief korte bouwtijd en een hoog kwaliteitsniveau. De productietijd van de staalconstructie speelt een belangrijke rol. Dankzij onze moderne productiefaciliteiten zijn wij in staat grote volumes te produceren met een korte doorlooptijd. 

“The entire parking garage is demountable and modular. Reuse as a whole or in part is possible and thus supports and stimulates EZ Park the circular economy.”

 